Supplier and inventory
Lead time by supplier over time and shipment status by supplier, built from a shipments log, to find the vendor behind your stockouts.
When a warehouse runs out of stock, the first suspect is demand. Often it's the supply side: a vendor that quietly started shipping slower. This guide finds it with a calculated lead time and two charts.

The question
Renee plans inventory for a five-warehouse tool distributor. Two SKUs ran out at the Reno warehouse this spring, and sales wants to know why. She suspects a supplier, but needs the shipment dates to prove it.
If you chase late POs one email at a time, start here.
The data
The sample file is shipments.csv: 1,373 shipments from four suppliers, July 2024 through June 2025.
| Column | What's in it |
|---|---|
| Shipment ID | One row per shipment |
| Supplier | Pacific Rim Components, Sierra Tool Supply, Keystone Metalworks, Great Lakes Fastener Co |
| SKU, Warehouse | What shipped and where |
| Order Date, Promised Date, Delivered Date | The shipment's timeline |
| Units | Quantity |
| Status | Delivered, Delivered Late, Delayed, In Transit |
A companion file, inventory-snapshots.csv, has weekly on-hand stock per SKU and warehouse if you want to chart stock levels next to lead times.
Build it
- On Home, click Start an analysis, open Files and drop in
shipments.csv. - Go to Analyze. In Start your dashboard, type this into Describe it...:
Build a supplier performance dashboard from shipments. Lead days is the number of days from Order Date to Delivered Date. Show KPI cards for shipments, average lead days, and late shipments (Status is Delivered Late or Delayed). Add a line chart of average lead days by Supplier by month of Order Date, and a stacked bar of shipment count by Supplier colored by Status. Include a Supplier slicer and a Warehouse slicer.- Check the lead time. Our first build got it wrong, so we told chat exactly how to compute it:
Avg Lead Days is wrong. Create a calculated field Lead Days = DATEDIFF('day', [Order Date], [Delivered Date]) and use AVG(Lead Days) in the Avg Lead Days card and in the line chart by Supplier and month.Chat adds Lead Days to your fields and rewires both charts.
What you'll find
One supplier slipped in March
Three suppliers hold steady all year: Great Lakes around 9 days, Keystone around 10 and Sierra around 16. Pacific Rim Components runs about 12 days until March 2025, then jumps to about 25 and stays there.
And it shows up as late shipments
The status bars confirm it. Pacific Rim is the only supplier with a large late slice, and it's a small supplier by volume, which is why it was easy to miss in a total.

Filter the Warehouse slicer to Reno: Pacific Rim supplies the power tools that ran out.
Make it yours
Any shipments or PO log with an order date and a received date works. Add a promised date to measure on-time delivery against what the vendor committed to.
FAQ
What about shipments that haven't arrived? They have no Delivered Date, so they're left out of average lead days. Count them separately with Status = In Transit or Delayed.
Can I see each shipment on a timeline? Yes, with a Gantt chart from Order Date to Delivered Date. Filter it to one supplier first, or it's too many rows to read.
Can I write the formula myself? Yes. Add a calculated field from the data panel. See Calculated fields.